• Rubber Sheet Production Line, Recyling Rubber Production Line
  • Rubber Sheet Production Line, Recyling Rubber Production Line
  • Rubber Sheet Production Line, Recyling Rubber Production Line

Rubber Sheet Production Line, Recyling Rubber Production Line

Warranty: 1 Year
Service Life: ≥15 Years
Certification: CE, ISO, SGS
Voltage: 380V
Structure: Horizontal
Weight: 50~300 Tons
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
XKJ-480
Power
>100kw
Using Life
≥15 Years
Customized
Customized
Transport Package
Standard Export Packing or as Your Requested
Specification
ISO9001: 2008, CE, SGS
Trademark
SFC
Origin
China
HS Code
8477800000
Production Capacity
50 Sets/Year

Product Description

Rubber Sheet Production Line, Recyling Rubber Production Line XKJ-480

1. Desulfurization Tank

2. Reclaimed Rubber Mixing Machine
Reclaimed Rubber Producing Process: Rubber powder → Devulcanizer Tank → Reclaimed Rubber Mixing Machine A → Reclaimed Rubber Mixing Machine B → Rubber Refiner Mill → Reclaimed rubber.
Technical Parameters XKN-450
Front Roll Diameter(mm) 450
Rear Roll Diameter(mm) 510
Working Surface Length(mm) 1000

Front Roll Linear Speed(m/min)
28.63
Front/Rear Speed Ratio 1:1.956(:Can Be Designed)
Motor Power (KW) 55
Overall Size (L×W×H) (mm) 4800×2070×1860

3. Rubber Strainer
Model XJL-150 XJL-200 XJL-250
Diameter of Screw (mm) 150 200 250
L:D 1:5.14 4.5:1 4:1

Screw Rotational Speed (RPM)
53 45 40
Motor Power (KW) 37 55 110
Steam Pressure (MPa) 0.6-0.8 0.6-0.8 0.6-0.8

Cooling Water Pressure(MPa)
0.2 0.2 0.2
Capacity (KG/H) 450 900 1800

4. Reclaimed Rubber Refining Mill
Model XKJ-450 XKJ-480
Front Roller Diameter(mm) 450           480
Rear Roller Diameter(mm) 510        612
Roller Working Length(mm) 900 800
Linear Velocity Front Roller (m/min) 28.646                   32.8
Friction Ratio of Front and Back Rollers 1:1.958
(Can Be Designed)
1:1.82
(Can Be Designed)
Main Motor Power(KW) 55 55
Dimension(L×W×H)(mm) 4500×2100×1950 4850×2100×1950


Our Services
 
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.

2. In the process of production, we will take photos and send to customers for their track the progress.

3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.

4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.

5. We supply overseas engineer service and help to train your workers to operate the machine.
 
 
FAQ
 
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
 
 
Packaging
 
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.

There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with cosco, for ensuring the goods arriving port on time.
    

our machineries have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.

If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now