Rubber Calender, Three Rolls Rubber Calender

Warranty: 1 Year
Control Type: PLC
Automatic Grade: Automatic
Power Source: Mechanical
Type: General Rubber Machinery
Model: Xy-230X630
Customization:

Contact Supplier

Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
XY-230x630
Roller Diameter
230mm
Roller Working Length
630mm
Friction Ratio
1:1
Roller Linear Speed
7.79rpm
Nip Adjustment Range
0-4.5mm
Product Thickness
0.2mm
Products Width
250mm
Motor Power
5.5kw
Dimension
2200X530X1470 (Mm)
Transport Package
Safety Wood or Plywood Crates Packaging
Specification
ISO9001: 2008, SGS, CE
Trademark
SFC
Origin
China
HS Code
847780000
Production Capacity
50 Sets/Year

Product Description

Rubber Calender, Two Rolls Rubber Calender

LIGHTSPOT:
1. 20 years on rubber calender manufacturing and exporting.
2. Delivery within 40 days.
3. Safety wood or plywood crates packing.
4. Full transportation insurance.
5. Sell to 126 countries on 6 continents.
6. One-stop rubber machinery solution in Qingdao Shun Cheong
7. This Rubber Calender is used to manufacture the special seal rings in petroleum mechanical.
8. PLC control Method.
9. Customers can choose according to their needs.
10. The new design concept, strong technical force and advanced manufacturing processes of the company ensure that each rubber vulcanizing press can be manufactured to meet customer's individual requests.

CERTIFICATE:
Qingdao Shun Cheong Machinery Co., Ltd is the professional manufacturer of various vulcanizing press and press machine. Our company has passed ISO9001: 2008 Quality Management System Certification and our products have qualified with Sweden SGS Certificate, and CE Certificate.

DETAILED INTRODUCTION:
1. Working Conditions
1.1 Machine Working Environment: temperature 7~40ºC, maximum relative humidity 95%.
1.2 Power:  Power: 380V 50HZ 3 phases
      Compressed Air:0.6~0.8MPa
      Cooling Water Pressure:0.4MPa
 
2. Structure Specification
 2.1 Body
  (1) Body frame: Welded into shape, after annealing, overall processed through precise machine tool, high rigidity, not easy becoming deformed, smooth, wear-resisting.     
  (2) Base: Welded base, after annealing and machining, high rigidity, won't deform easily. 
 
 2.2 Rolls and Bearing Group
   (1) Roll Structure: hollow smooth rolls
   (2) Material: Alloy cold harden cast iron LTH-H
   (3)  Hardness:68-72HSD
   (4) Cold Harden Layer:10-25mm 
   (5) Main Bearing: cylindrical roller bearings (Wafangdian Metallurgy Bearing)
   (6)Bearing seats adopts cast iron (FC30), made from tempering handling. Excellent intensity and     precision, together with lubrication oil holes. The bearing seats are made of aluminum with labyrinth ring oil seals to keep from oil leaking of inside and outside.
  (7)Rolls nip has max. nip protecting function.
  (8)Rolls temperature adjusting adopts high quality revolving joint and stainless metal pipe.
 
 2.3 Nip Adjustment Device
  (1) Adjusting Speed:3.6mm/min
  (2) Motor Driving Power:1.5KW
 
2.4 Drive Mode
Adopts: driving motor reducer→stick coupler→driving gears →rolls rotating.
 
2.5 Reducer
 (1)Type:one motor input, one pc shaft output.
 (2)Gears: Hard gear surface, closed oil immersed harden gear surface reducer. Noise≤78dB,safety factor:SA≥2.
 
2.6 Main Motor
Main motor adopts inverter motor, through frequency converter adjusting motor rotating speed. 
 
2.7 Lubrication System
 (1) Bearing Lubrication: the whole system contains a oil tank, including flow adjustment, oil table, cooler, filter and so on. It is to control the oil flow, cut down lubricating oil temperature and keep the oil clean.   
 (2) Thin oil lubricating pipes.
 
2.8 Stop guider group
2.8.1 Mode:axial moving type
2.8.2 This part adopts high quality SS41 steel welding, contact parts with the roller using MC nylon products, manual axial movement to adjust the spacing
 
3.9 Emergency braking equipment
3.9.1 Mode: Electro-hydraulic block brake.
3.9.2 Brake Capability: After braking roller skating for≤ 1/4 circumference.
3.9.3 Tight setting button installing equipment: in the left and right, front and back installed with mushroom mode tight buttons. 
 
2.10 Electrical control group
2.10.1 Control cabinet: Surface paint floor type.    
2.10.2 Operating Box: Operation control circuit.    
2.10.3 Before leaving factory, manufacturer is responsible for connecting all the wires from controlling box to operation box, the useronly needs to connect the outside wire to the controlling box. 

4. Technical Parameters

XY Three Roll

Model Item
XY-3I 630
XY-3L 630
XY-3630
XY-3I 1120A
XY-3 1120A
XY-3L 1120A
XY-3I 1400XY-3I 1500XY-3I 1730XY-3I 2130XY-3I 2430
Roll diametermm230360400450610710810
Roll working lengthmm630112014001500173021302430
 
Roll ratio

1:1:1
1:1.42:1
1:1:1
0.733:1:1
0.733:1:0.733
1:1:1
1:1.383:1.383
1:1.383:1
1:1:1
1:1.5:1
1:1:1
1:1.4:1
1:1:11:1:1
1:1.5:1
Middle roll speedr/min0.8-83-21.063-26.392.62-26.25.4-548-502-20
Adjusting nip rangemm0-70-100-100-60-200-200.5-25
Min.Calendering product thicknessmm0.20.20.20.20.150.150.5
Calendering product widthmm100-500500-12001400140019002150
Motor powerkW7.5455575132185220
Overall dimensionsmm3168555065007420701076509300
mm890164015002200395045603150
mm1830212024402900373040805200
About weightt~2.6~11~22~26~52~67~94 

Our Services
 
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.

2. In the process of production, we will take photos and send to customers for their track the progress.2.
? Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.

3. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.

4. We supply overseas engineer service and help to train your workers to operate the machine.
 
 
FAQ
 
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
 
 
Packaging
 
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.

There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with cosco, for ensuring the goods arriving port on time.

In addition, our machineries have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.

If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!
    

Send your message to this supplier

*From:
*To:
avatar Mr. Jack Chen
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now