Customization: | Available |
---|---|
After-sales Service: | 12 Month |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Semi-automatic Waste Tires Recycling Line/Rubber Powder Production Line
Waste tire recycling line is used to make the tire into rubber powder.Waste tire recycling machine, waste tire recycling equipment prices for sale, waste tyre recycling plant cost is used to crush the waste tire into rubber powder.
No | Name |
model |
quantity | Power |
whole tire pre-processing , you will get < 50*50MM rubber crumb | ||||
1 |
Ring cutter |
QQJ-1200 |
1 |
5.5KW |
2 |
Loop machine |
YQJ-295 |
1 |
15KW |
3 |
Strip cutter |
QTJ-370 |
1 |
5.5 KW |
4 |
Block cutter |
QKJ-200 |
1 |
11 KW |
Rubber powder processing: you will get 20-30 mesh rubber powder,at the same time, separate the fiber and steel wire | ||||
5 |
Tyre crusher |
XKP400 |
1 |
45 KW |
XKP450 |
55 KW |
|||
XKP560 |
75 KW |
|||
6 |
Big conveyor equipment |
BCL-8 |
1 |
2 KW |
7 |
Small conveyor equipment |
BCL-3 |
1 |
1.1 KW |
8 |
Big Magnet separator |
BMS22 |
1 |
2.2 KW |
9 |
Small Magnet separator |
SMS-1 |
1 |
1.1 KW |
10 |
Big Shaking screen |
BSS-8 |
1 |
7.5 KW |
11 |
Small Shaking screen |
SSS-3 |
1 |
3 KW |
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.Small machine usually takes within 2~3 days.Big plant usually takes about 30 days.