Secured Trading Service

Four Roller Rubber Calender Machine

  • Audited Supplier
  • 7 yrs

Contact Supplier

Product Highlights

  • Customized Design: Machine structure and packaging can be customized to meet specific client requirements.
  • High Hardness Rollers: Rollers made of chilled alloy cast iron with hardness of 68-72HSD and 10-25mm chilling layer.
  • Precision Nip Adjustment: Adjustment speed of 3.6mm/min with independent or simultaneous control at both ends.
  • Variable Frequency Drive: Main motor uses frequency converter for precise speed adjustment and stable operation.
  • Durable Construction: Machine body and bedplate undergo annealing treatment to prevent deformation and ensure rigidity.
  • Advanced Lubrication: Integrated oil tank system with temperature control and filtration to guarantee oil cleanliness.
  • Long Service Life: Designed for a service life of 15 years or more with high-quality components.
  • Comprehensive Warranty: One-year quality guarantee covering mechanical defects and component performance.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Four Roller Rubber Calender Machine

Four Roller Rubber Calender Machine pictures & photos
Four Roller Rubber Calender Machine
Four Roller Rubber Calender Machine pictures & photos
Four Roller Rubber Calender Machine
Four Roller Rubber Calender Machine pictures & photos
Four Roller Rubber Calender Machine
  • Four Roller Rubber Calender Machine
    Four Roller Rubber Calender Machine
  • Four Roller Rubber Calender Machine
    Four Roller Rubber Calender Machine
  • Four Roller Rubber Calender Machine
    Four Roller Rubber Calender Machine

Find Similar Products

Product Description

Four Roller Rubber Calender Machine XY-4L 610X1730

Four Roller Rubber Calender Machine





Application
Mainly used for manufacturing rubber cord and calendaring rubber sheet.

Four Roller Rubber Calender Machine


   
Structure Instruction

Four Roller Rubber Calender Machine



1.1 Machine Body

1.2 Rack: welding fabrication and through annealing treatment, precision machine tools comprehensive processing, strong rigidity, not deformation, the sliding surface is smooth and wear-resistant.

1.3 Bedplate: Welding type bedplate and through annealing treatment and then machine processing, high strength and not deformation.

1.4 Roller and Bearing
    Roller Type: Hollow Light Roller
    Material: Chilled Alloy Cast Iron LTH-H
    Hardness: 68-72HSD
    Chilling Layer: 10-25mm
    Host Bearing: Four Radial cylindrical roller bearings (Wafangdian(China One of first best brand) metallurgy bearing)
    Bearing Bedplate: Casting made by tempering processing, with a lubricating oil hole.
    Roller Space has protected by the Max. Distance.
    Roller Temperature using high quality rotary joint and stainless steel metal pipes.

1.5 Nip Adjustment Device
    Nip Adjustment Speed: 3.6mm/min
    Drive Motor Power: 1.1 KW
    Nip Adjustment using 1#Roller, 2# and 4#Roller. It can adjust at both ends at the same time and can adjust separately.

1.6 Transmission Type
    It is using motor drive speed reducer, through stick pin couplings, friction ratio drive the roller rotation.

1.7 Speed Reducer
   Type: One Motor input, and one shaft output.
   Gear: Hard-tooth type

1.8 Main Motor
    The main motor using frequency motor and through variable-frequence governor adjust the motor rotate speed.
1.9 Lubrication System
    Bearing Lubrication: This system has one set of oil tank, it including flow adjust, oil temperature  gauge, condenser, filter etc. and flow control, and lower the lubrication oil temperature and guarantee the cleanness of the lubrication oil.
2.0 Grease lubrication pipes.

Four Roller Rubber Calender Machine


Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.

FAQ
1. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.

2. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.

3. Are you able to give installation and commissioning overseas?How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big production line usually takes about 30 days.

4. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.


 
♦ We supply overseas engineer service and help to train your workers to operate the machine.

Four Roller Rubber Calender Machine
In addition, our rubber vulcanizing press have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.

If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information.

Welcome to visit our factory!

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR235468". Items marked "verified" are certified.

Watch Video
Watch Video
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.
Qingdao Shun Cheong Rubber Machinery Manufacturing Co., Ltd.

About Our Factory & Business Background

Address
No. 1 Kangting Street, Huangdao New District, Qingdao, Shandong, China
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
Qingao Port

Our Production Capability & Technical Expertise

Main Products
Rubber Mixing Mill, Vulcanizing Press, Rubber Kneader, Tire Recycling Machine, Rubber Calender, Batch off Machine, Conveyor Belt Vulcanizing Press, Rubber Extruder, Reclaimed Rubber Machine

Our Industry Experience & Global Business Record

Export Year
2002-09-02
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.
What's the machine quality guarantee?
Quality guarantee time is one year. We choose world famous brand components to keep our machine in perfect working condition.
Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big production line usually takes about 30 days.
How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.
Do you provide training for machine operation?
We supply overseas engineer service and help to train your workers to operate the machine.
Where are your products exported?
Our rubber vulcanizing press have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now