Tire Recycling Machine, Reclaimed Rubber Production Line XKJ-480
1. Desulfurization Tank
2. Reclaimed Rubber Mixing Machine
Reclaimed Rubber Producing Process: Rubber powder → Devulcanizer Tank → Reclaimed Rubber Mixing Machine A → Reclaimed Rubber Mixing Machine B → Rubber Refiner Mill → Reclaimed rubber.
Technical Parameters |
XKN-450 |
Front Roll Diameter(mm) |
450 |
Rear Roll Diameter(mm) |
510 |
Working Surface Length(mm) |
1000 |
Front Roll Linear Speed(m/min) |
28.63 |
Front/Rear Speed Ratio |
1:1.956(:Can Be Designed) |
Motor Power (KW) |
55 |
Overall Size (L×W×H) (mm) |
4800×2070×1860 |
3. Rubber Strainer
Model |
XJL-150 |
XJL-200 |
XJL-250 |
Diameter of Screw (mm) |
150 |
200 |
250 |
L:D |
1:5.14 |
4.5:1 |
4:1 |
Screw Rotational Speed (RPM) |
53 |
45 |
40 |
Motor Power (KW) |
37 |
55 |
110 |
Steam Pressure (MPa) |
0.6-0.8 |
0.6-0.8 |
0.6-0.8 |
Cooling Water Pressure(MPa) |
0.2 |
0.2 |
0.2 |
Capacity (KG/H) |
450 |
900 |
1800 |
4. Reclaimed Rubber Refining Mill
Model |
XKJ-450 |
XKJ-480 |
Front Roller Diameter(mm) |
450 |
480 |
Rear Roller Diameter(mm) |
510 |
612 |
Roller Working Length(mm) |
900 |
800 |
Linear Velocity Front Roller (m/min) |
28.646 |
32.8 |
Friction Ratio of Front and Back Rollers |
1:1.958
(Can Be Designed) |
1:1.82
(Can Be Designed) |
Main Motor Power(KW) |
55 |
55 |
Dimension(L×W×H)(mm) |
4500×2100×1950 |
4850×2100×1950 |
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with cosco, for ensuring the goods arriving port on time.
our machineries have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.
If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information.
welcome to visit our factory!