Batch off Cooling Line, Batch off Cooling Machine
Features:
1. The batch cooler is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.
2. Structure characteristics: There are three structures types: chain-belt, overhead, and floor-standing types.
3. The clients can choose high or low disposition according to the practical requirments.
4. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio (< =100mm);
5. There are three working positions for auto entering and outputting of material tray.
6. Auto rubber collecting device; Auto cutter device; It has high automatization and can realize unattended operation.
Parameter:
Model |
XPG-600 |
XPG-600 |
XPG-800 |
XPG-900 |
Structure |
Floor-standing type |
Chain-Belt type |
Overhead type |
Overhead type |
Max. Rubber Sheet Width (mm) |
600 |
600 |
800 |
900 |
Rubber Sheet thickness (mm) |
4-10 |
2-12 |
4-10 |
6-12 |
Temperature over room temperature after rubber sheet cooling (º C) |
10 |
10 |
15 |
5 |
Linear Speed of taking-in conveyor (m/min) |
3-24 |
3-24 |
3-35 |
4-40 |
Linear speed of sheet-hanging chain (m/min) |
0.82 |
Chain-belt layer: 5 |
0.117-1.17 |
4-40 |
Hanging height of the sheet hanging bar (m) |
1000-1500 |
Net |
1000-1500 |
1400 |
No. of cooling fans (set) |
12 |
|
20 |
18-26 |
Total power (KW) |
13.7 |
|
28.8 |
18-34 |
Overall Dimension(mm) |
L |
1425 |
|
16800 |
26630 |
W |
4500 |
|
4700 |
3500 |
H |
3405 |
|
3520 |
5630 |
FAQ
1. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.
2. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
3. Are you able to give installation and commissioning overseas?How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big production line usually takes about 30 days.
4. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers.
If you come to our factory, we can show the user around us.
5. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.
Our Services
♦ Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
♦ In the process of production, we will take photos and send to customers for their track the progress.
♦ Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
♦ We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
♦ We supply overseas engineer service and help to train your workers to operate the machine.
Welcome your inquiry!