Rubber Calender with Ce Certification Three Roll Rubber Calender

Product Details
Customization: Available
Warranty: 1 Year
Control Type: PLC

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001
Find Similar Products

Basic Info.

Model NO.
XY--3-630
Automatic Grade
Automatic
Power Source
Electric
Type
Rubber Calender
Roll Diameter: 230mm
Roll Working Length: 630mm
Roll Ratio: 1: 1:1
Midder Roll Speed:0.8-8 R/Min
Adjusting Nip Range: 0-7mm
Min. Calendering Product Thickness: 0.2mm
Calendering Product Width:100-500mm
Motor Power: 7.5kw
About Weight:2.6t
Export Markets: Global
Type of General Rubber Machinery
Material Processing Machine
Type of Tire Machinery
Rubber Regeneration Machinery
Certification
CE, ISO
Weight
<50 Tons
Power
10~100kw
Transport Package
No Packing or as The Customer′s Request
Specification
According to The Customer′s Requirements
Trademark
SFC
Origin
Qingdao, China
HS Code
8477800000
Production Capacity
50 Sets/Month

Product Description

Rubber Calender with CE Certification, Three Roll Rubber Calender

Rubber Calender with Ce Certification Three Roll Rubber Calender


Rubber Calender with Ce Certification Three Roll Rubber Calender

Rubber Calender with Ce Certification Three Roll Rubber Calender

FAQ
 
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.

Packaging
 
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.


Welcome to visit our factory!

Rubber Calender with Ce Certification Three Roll Rubber Calender

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier