Two Roll Rubber Calender Machine

Product Details
Customization: Available
Warranty: 1 Year
Certification: CE, ISO

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001
  • Two Roll Rubber Calender Machine
  • Two Roll Rubber Calender Machine
  • Two Roll Rubber Calender Machine
  • Two Roll Rubber Calender Machine
  • Two Roll Rubber Calender Machine
  • Two Roll Rubber Calender Machine
Find Similar Products

Basic Info.

Condition
New
Customized
Customized
Automatic Grade
Automatic
Structure
Vertical
Voltage
as Your Requirement
Type of General Rubber Machinery
Rubber Calender
Transport Package
Standard Export Packages
Specification
CE, ISO, SGS
Trademark
SFC
Origin
China
HS Code
8477800000

Product Description

two roll rubber calender machine

Two Roll Rubber Calender Machine



1. Working Conditions
1. Machine Working Environment:temperature 7~40ºC,maximum relative humidity 95%.
2.Power:  Power: 380V    50HZ 3 phases
             Compressed Air:0.6~0.8MPa
             Cooling Water Pressure:0.4MPa
 
2. Main Technical Regulations
 
1. Technical Parameters
1.1 Rolls
     Roll Diameter.....................¢360mm
     Roll Working Length..................900mm
     Roll Structure.....................Hollow Smooth Roll
     Roll Surface Hardness................HS68-72
     Roll Surface Finish..................Ra1.6
     Rolls Arrangement..................I Type
1.2 Roll Speed Ratio.....................1:1
1.4 Nip Adjustment Device                  
      Nip Range.....................0-10mm
      Electrical Motor Power......... ......1.5KW
1.5 Main Motor
      Power........................37KW
 

Model
XY-2I-320 XY-2I-630 XY-2I-900 XY-2I-1500 XY-2I-1830 XY-2I-1730
Roller Diameter (mm) 160 230 360 450 550 610
Roller Working Length (mm) 320 630 900 1500 1830 1730
Linear Velocity 1:1 1:1 1:1 1:1 1:1.08 1:1
Friction Ratio(r/min) 7.79 14.8 3-20.2 2.5-24.8 2-18.7 4-36
Nip Adjust Range (mm) 0-4.5 0-5.5 0-10 0-10 0-12 0-15
(Products Min Thickness (mm) 0.2 0.2 0.2 0.2 0.2 0.2
Products Width() 250 580 920 1250 1600 1500
Main Motor Power (kW) 5.5 15 37 45 75 90

Packaging
 
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.

Two Roll Rubber Calender Machine


 
FAQ
 
1. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.
 
2. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
3. Are you able to give installation and commissioning overseas?How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big production line usually takes about 30 days.
 
4. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers.
 
If you come to our factory, we can show the user around us.
 
5. How can we go to your side?
 
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.
 
Our Services
 
Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
 
In the process of production, we will take photos and send to customers for their track the progress.
 
Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
 
We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
 
We supply overseas engineer service and help to train your workers to operate the machine.

Two Roll Rubber Calender Machine


                                                                                    Welcome to our factory!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier