Waste Tyres Recycling Two Roll Rubber Crusher
Cracker Mill, Rubber Crusher
1. This machine is used for crushing rubber and plastic. The roll made of alloy chilled cast iron is better than those of common chilled cast iron.
2. The interior of the two rolls is empty and spray type. The temperature of roll surface is even.
3. To assure the safety, we install emergency pulling up equipment. Convenient range adjustment is set in manually operation. The safety shut down in manual operation is set, with the function of automatic crawl back swing the roll.
4. Convenient range adjustment is set in manually operation. The whole machine adopts channel-bottom head for convenient carrying and maintance.
Notes: Nylon bush with grease lubricating Copper bush with grease/oil lubricating
Technical parameter \ Type |
XKP-400 |
XKP-450 |
XKP-560 |
Front roll diameter(mm) |
400 |
450 |
560 |
Rear roll diameter(mm) |
400(Groove roller) |
450(Groove roller) |
510(Groove roller) |
Working length of rolls(mm) |
600 |
650 |
800 |
Front roll surface speed(m/min) |
17.32 |
23.2 |
25.56 |
Friction ratio |
1: 1.38 |
1: 1.38 |
1: 1.30 |
Max. nip(mm) |
8 |
8 |
15 |
Motor power (kw) |
45 |
55 |
75 |
dimension(L× W× H)(mm) |
3950× 1800× 1780 |
4770× 1846× 1835 |
5064× 2284× 1978 |
Our Services
Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
In the process of production, we will take photos and send to customers for their track the progress.
Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
We supply overseas engineer service and help to train your workers to operate the machine.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with cosco, for ensuring the goods arriving port on time.