Open Rubber Mixing Mill with Stable Quality
Contact Supplier
Product Highlights
- CE Certified Quality: Meets current world standards with CE, ISO, and SGS certifications for reliable performance.
- Factory Pre-Assembly: Wires pre-connected between motor and control cabinet to save time and reduce debugging costs.
- Load Testing: 4-6 hours load test before delivery ensures machine readiness and reduces on-site commissioning time.
- Low Maintenance Cost: No continuous lubrication required, saving on lubrication costs, wear, tear, and maintenance efforts.
- High Productivity: Superior mixing performance with low operating costs and compact construction for maximum floor utilization.
- Customizable Options: Model, roll diameter, roller length, and voltage are customizable to meet specific production requirements.
- Overseas Support: Professional installation and commissioning services available overseas with experienced engineers.
- Durable Components: Uses world-famous brand components to ensure perfect working condition and long service life.
Product Attributes
- Customization
- Available
- Warranty
- 1 Year
- Control Type
- Artificial
- Model NO.
- XK-560
- Automatic Grade
- Manual
- Power Source
- Electric
- Type
- Open Mixing Mill
- Model
- Xk-560
- Front Roll Diameter
- 560mm
- Rear Roll Diameter
- 510mm
- Roller Working Length
- 1530mm
- Voltage
- 208/220/380/415/440/480V etc.
- Capacity Per Batch
- 35-50kg
- Service Life
- Longer Than 15 Years
- Certification
- ISO, CE, SGS
- Transport Package
- Safety Wood or Plywood Crates Packaging
- Specification
- SGS, ISO9001: 2008, CE
- Trademark
- SFC
- Origin
- China
- HS Code
- 8477800000
- Production Capacity
- 50 Sets/Month
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Open Rubber Mixing Mill with Stable Quality
Find Similar Products
Product Description
| Item | XK-160 | XK-250 | XK-360 | XK-400 | XK-450 | XK-550 | XK-560 | XK-660 | XK-710 | |
| Roll diameter | mm | 160 | 250 | 360 | 400 | 450 | 550 | 560-510 | 660 | 710 |
| Roll working length | 320 | 620 | 900 | 1000 | 1200 | 1500 | 1530 | 2130 | 2200 | |
| Front roll linear speed | r/min | 9 | 16.3 | 16.7 | 19.3 | 21.8 | 22.5 | 27.2 | 28 | 31.9 |
| Speed ratio of rolls | 01: 01.4 | 01: 01.1 | 01: 01.3 | 01: 01.3 | 01: 01.3 | 01: 01.2 | 01: 01.2 | 01: 01.2 | 01: 01.5 | |
| Max roll space | mm | 4.5 | 8 | 10 | 10 | 12 | 16 | 15 | 0.5-15 | 0.5-15 |
| Compound feeding capacity | kg | 1-2 | 10-15 | 20-25 | 18-35 | 50 | 50-65 | 50-65 | 165 | 190 |
| Motor power | kW | 5.5 | 18.5 | 30 | 45 | 55 | 110 | 90 | 240 | 280 |
| Dimensions(L× W× H) | ||||||||||
| L | mm | 1133 | 2722 | 4200 | 4920 | 5405 | 6646 | 6270 | 7280 | 8185 |
| W | mm | 920 | 1115 | 1780 | 1780 | 1740 | 2736 | 2282 | 3400 | 3910 |
| H | mm | 1394 | 1345 | 1760 | 1800 | 1790 | 2105 | 2000 | 2530 | 2270 |
| Gross weight | T | ~2 | ~3.2 | ~6.5 | ~8 | ~11.4 | ~22 | ~22.5 | ~49 | ~51 |



Salient Features:
1. Superior Mixing Performance.
2. Low Operating Cost with High Productivity.
3. Compact Construction, maximum Floor Utilization.
4. Latest Technology Update, Meets Current World Standards.
5. Maintenance Free.
6. Reliable and Experienced Service Back Up.
7. Easy to Install & Ready to Run.
8. No continuous Lubrication hence heavy saving on lubrication cost, wear & tear and maintenance.
9. Auto reversing electric Panel.
10. Simple & easy maintenance.
Test Before Delivery:
In order to save time and cost for customers, we produced rubber mixing mill at the factory wires between the motor and the control cabinet already connected, the customer's only need to connect the wires to the outside the control cabinet. After Rubber Mixing Mill complete installation will have the load test 4-6 hours to reduce debugging time and cost.

FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with cosco, for ensuring the goods arriving port on time.
In addition, our machineries have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR235468". Items marked "" are certified.
Company Profile
Qingdao Shun Cheong Machinery Co., Ltd. (Original China Qingdao first Rubber Machinery Factory) was founded in 1968, which is a professional manufacturer in rubber machine field of China with high-tech technology. We have ISO9001: 2008, CE1282 and SGS certification. Our customers spread all over the world, such as the United States, Germany, Brazil, Singapore, Malaysia, India, Russia etc. Our company's major customers including: Michelin, Bridgestone Americas Tire Operations, LLC, Kumho, Cheng Shin Rubber Industry, United States Goodyear Tire & Rubber Company etc.
Reduce the production cost and supply high efficiency rubber machines are the target aim of our service. Our company is near from Qingdao steel factory and Qianwan port, which is largely lowering the logistics cost; Germany and United States' core talents and experienced engineers and outstanding technical teams have been introduced, constantly improving the R&D capability, with the advanced fabricating equipment to develop the world excellent rubber machine, satisfying the clients high requirements.
In order to supply better service for our customers, we also provide the conveyor belt production line, waste tire processing line, tire and other rubber products' producing on- site for customers to visit and consult.
1. Our company machines must pass inspection of 3-7 hours of load test operating before they leave the factory, thus saving customers' time and expense of equipment commissioning.
2. We provide one year's guarantee and once the equipment damage during this time we supply free of charge. In order to save maintenance time and reduce the production cost of the guests, you can contact our DCRC by email, MSN or Skype etc., and we will send professional technical personnel with English translation to you to solve equipment problems.
3. Our company establishes "CUSTOMER FILE" for sold equipment in the form of return visits regularly; Including equipment's maintenance, troubleshooting and customer feedback.
4. Complete after-sales service
About Our Factory & Business Background
- Address
- No. 1 Kangting Street, Huangdao New District, Qingdao, Shandong, China
- Terms of Payment
- LC, T/T
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month - Nearest Port
- Qingao Port
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2002-09-02
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is the delivery time for the rubber machines?
- Since these are specially designed machines based on specific requirements, the process from engineering design to production completion takes approximately 25 to 35 days.
- How do you ensure quality control during production?
- We prioritize quality control from start to finish. Every machine is fully assembled and carefully tested before shipment to ensure it meets our high standards.
- What is the warranty period for the machine?
- The quality guarantee period is one year. We use world-famous brand components to keep the machine in perfect working condition throughout this period.
- Do you provide overseas installation and commissioning services?
- Yes, we supply overseas service and technical support. The customer covers the cost. Small machines typically take 2-3 days, while large plants take about 30 days.
- How can I trust that I will receive the correct machine as ordered?
- We guarantee delivery of good quality machines as discussed and confirmed in the order. Our company culture focuses on innovation, quality, integrity, and efficiency, backed by successful cooperation with major manufacturers.
- What are the packaging methods for the equipment?
- Painting is completed before delivery and wrapped with stretch film to prevent damage. Key parts like the electronic control box are shockproof packed. Wooden packaging can be customized, and items are packed in wooden cases.
- What are the terms of payment?
- We accept LC (Letter of Credit) and T/T (Telegraphic Transfer) as terms of payment.
- What is the average lead time for production?
- The average lead time is one month during the off-season and 1-3 months during the peak season.
Send your message to this supplier
People who viewed this also viewed
-
US$55,700.00 / Set
-
Automobile Sound Insulation Sheet Production Line, Butyl Rubber Anti-Vibration Sheet Production LineUS$15,000.00-20,000.00 / Set
-
US$1,700.00-2,200.00 / Set
-
US$14,000.00-65,000.00 / Set
-
US$2,000.00-5,000.00 / Set
-
US$12,000.00-14,000.00 / Set
-
US$8,700.00 / Set
-
US$22,000.00-25,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Rubber Mixing Mill
- Open Rubber Mixing Mill with Stable Quality
Related Categories
Hot Searches
- Mixing Equipment Factories
- Mixing Machinery Factories
- China Mixing
- Mixing System Factories
- Mixing Mill Machine
- Rubber Mixing Mill Machine
- Mixing Mill For Rubber
- Rubber Mixing Mill Machinery
- Mixing Mill Machine For Rubber
- Rubber Mixing Mill Bulkbuy