Rubber Open Mixing Mill for Rubber Processing, Open Mixing Mill XK-360
|
Item |
XK-160 |
XK-250 |
XK-360 |
XK-400 |
XK-450 |
XK-550 |
XK-560 |
XK-660 |
XK-710 |
Roll diameter |
mm |
160 |
250 |
360 |
400 |
450 |
550 |
560-510 |
660 |
710 |
Roll working length |
|
320 |
620 |
900 |
1000 |
1200 |
1500 |
1530 |
2130 |
2200 |
Front roll linear speed |
r/min |
9 |
16.3 |
16.7 |
19.3 |
21.8 |
22.5 |
27.2 |
28 |
31.9 |
Speed ratio of rolls |
|
01: 01.4 |
01: 01.1 |
01: 01.3 |
01: 01.3 |
01: 01.3 |
01: 01.2 |
01: 01.2 |
01: 01.2 |
01: 01.5 |
Max roll space |
mm |
4.5 |
8 |
10 |
10 |
12 |
16 |
15 |
0.5-15 |
0.5-15 |
Compound feeding capacity |
kg |
1-2 |
10-15 |
20-25 |
18-35 |
50 |
50-65 |
50-65 |
165 |
190 |
Motor power |
kW |
5.5 |
18.5 |
30 |
45 |
55 |
110 |
90 |
240 |
280 |
Dimensions(L× W× H) |
|
|
|
|
|
|
|
|
|
|
L |
mm |
1133 |
2722 |
4200 |
4920 |
5405 |
6646 |
6270 |
7280 |
8185 |
W |
mm |
920 |
1115 |
1780 |
1780 |
1740 |
2736 |
2282 |
3400 |
3910 |
H |
mm |
1394 |
1345 |
1760 |
1800 |
1790 |
2105 |
2000 |
2530 |
2270 |
Gross weight |
T |
~2 |
~3.2 |
~6.5 |
~8 |
~11.4 |
~22 |
~22.5 |
~49 |
~51 |
STRUCTURAL FEATURES:
1. Open mixing mill is ZSY series hardened reducer, six precision carburizing and tooth grinding cylindrical gears, low noise, long life and large endurance; roller bearing using fully automatic lubrication system specially designed sealed structure to eliminate oil spills.
2. This open mixing mill motor is overall welding pedestal, single shaft drive structure, compact structure, safe and reliable, simple to find the level of equipment when shipped to the client's company, simply connected into the return water pipeline, power line work can be carried out installation and debugging convenient.
![Rubber Open Mixing Mill for Rubber Processing, Open Mixing Mill Xk-360](//www.micstatic.com/athena/img/transparent.png)
![Rubber Open Mixing Mill for Rubber Processing, Open Mixing Mill Xk-360](//www.micstatic.com/athena/img/transparent.png)
Test Before Delivery:
In order to save time and cost for customers, the wires between the motor and the control cabinet of open mixing mill has been connected, the customer's only need to connect the wires to the outside the control cabinet. Aftercomplete installation will have the load test 4-6 hours to reduce debugging time and cost.
Our Services
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2. In the process of production, we will take photos and send to customers for their track the progress.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas engineer service and help to train your workers to operate the machine.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
Our machineries have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.
If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information.
Welcome to visit our factory!